Kent Fire Authority, Rochester Fire Station

Project Description
Services installations to a new build Fire Station and Road Safety Training Centre in Rochester.

The project was undertaken on a JCT with CDP contract.

Value
The total construction cost was circa £5.5M.

Timescales
The programme duration was approximately 13 months and completed in December 2015.

Services
The project comprised of:
• LED Lighting
• Heat Recovery Ventilation
• VRV Air Conditioning Systems
• Security/ Fire Alarm Systems
• Natural Ventilation
• Underfloor Heating
• Cold Water Booster Sets
• Generator Back Up
• Boiler Systems
• BMS Systems
• PV Array

Other Sector Experience – Public Sector
• Medway Fire Station, Kent Fire Authority

Milton Keynes Council, New Crematorium

Project Description
Working client side within a building services consultancy, delivered the full design and construction management for the M&E aspects of a new crematorium for Milton Keynes Council

The project involved unique AV systems, innovative use of natural ventilation and thermal mass and heat recovery from the mercury abatement system.

Value
The total construction cost was circa £5M.

Services
The project comprised of:
• LED Lighting
• Ground Source Heat Pumps
• VRV Air Conditioning Systems
• Security / Fire Alarm Systems
• Natural Ventilation
• Underfloor Heating
• Generator Back Up
• BMS Systems
• AV Systems

Other Sector Experience – Public Sector
• Medway Fire Station, Kent Fire Authority
• Rochester Fire Station, Kent Fire Authority