Paul Smith, Floral Street Store
Project Description
A substantial Fit-out of the existing flagship retail outlet at Covent Garden. A key aspect of the project was to keep the store in operation during the works, which was accomplished through 8 detailed phases.
The project was undertaken on a full design and build basis.
Value
The total construction cost was circa £500K.
Timescales
The programme duration was approximately 8 weeks and was completed in August 2016.
Services
• The project comprised of:
• Adaptation of Store
• Re-Furbishment of office area
• Relocation of storage facilities
• New staff area including kitchen
• Bespoke joinery
• Industrial chic M&E services
Other Sector Experience – Retail
• Godiva Chocolate, Canary Wharf
• Godiva Chocolate, St Pancras





Rickmansworth School, Swimming Pool
Project Description
My construction company undertook the full refurbishment of an existing dilapidated swimming pool for Rickmansworth School.
The project was undertaken on a full design and build basis
Value
The total construction cost was circa £1M.
Timescales
The programme duration was approximately 16 weeks and was completed in in January 2015.
Services
The project comprised of:
• Complete Re-Furbishment of the whole building
• Wet-room finishes throughout
• New changing and shower facilities
• New ceilings throughout
• Channel drainage systems
• Replacement roof
• Replacement façade/glazing
• New M&E systems
– IP65 LED Lighting
– Heat Recovery Ventilation
– New Boiler Systems working with a CHP system
– New Security/ Fire Alarm Systems